Project Examples

American Purpac Technologies
Beloit, WI
Design/Build Controls + Electrical
   
General Motors
Janesville, WI
Preferred Contractor since 1990
   
Chrysler Assembly Plant
Belvidere, IL
Preferred Contractor since 1985
   
EcoGrove Wind Farm
Waddams Grove, IL
Turn-key Services, 34.5KV Collection System, 100 Megawatt Wind Farm
   
US Gypsum
Washingtonville, PA
Conveyor Design/Build Controls & Electrical
   
Wal-Mart Distribution Center
Sterling, IL & Cheyenne, WY
1.25 Million SF
   
McCarran International Airport
Las Vegas, NV
D Gate Terminal Expansion - 125,000 Square Feet
   
Winnebago County Justice Center
Rockford, IL
500,000 Square Feet
   
Metso Paper
Beloit, WI
Design/Build Project

 

amp

©2012 Amp Electric. All Rights Reserved

Visit the Morse Group